Rigorous testing.
Rapid rewinding division.
Every transformer leaving our Alwar works is subjected to routine testing compliant with IS 2026 and IEC standards. When grid failures occur, our rewinding bay restores damaged units to factory tolerances.

Four verified testing stages before dispatch
Photographic documentation of our electrical and metrology inspection sequence.

High-Voltage Dielectric Withstand Test
Applied separate source overvoltage withstand test across HV and LV terminals, verifying complete barrier insulation against power grid lightning and switching surges.

Insulation Resistance & Polarization Index
Motorized digital megger insulation measurement at 2.5 KV / 5 KV between windings and grounded steel tank, verifying dryness of kraft paper barriers.

Turns Ratio & Vector Polarity Verification
Precision digital turns ratio meter measurement across all primary and secondary tap switch positions, ensuring zero phase angle error.

Routine Metrology & Core Inspection
Physical and electrical dimensional tolerance verification, lamination step-lap gap measurement, and winding clearance checks by senior QA engineers.
Repair and rewinding division
Slide below to inspect a transformer coil before rewinding and after precision Alwar factory restoration.